« Back Post Date: Friday, August 23, 2019
New Putting Green Construction Day 4/5
Day 4 included the start of drainage installation in the green cavity and 4 inches of pea gravel. Day 5 was the start of root-zone mix being added before being rained out mid morning. Pictures are included inside the post.